International Load Line Certificate
The Load Line certificate connects assigned freeboard, marks and ship condition. Validity also depends on surveys and maintained fittings, not only structural alterations.
Operational Explanation
Compare the certificate and conditions of assignment with the hull, openings and closing appliances. Assess changes beforehand with flag or RO: a repair does not automatically have the same effect as an alteration requiring increased freeboard.
Regulatory Reference
Articles 4–5 define the international regime. Exclusions cover warships, new ships under 24 m in length, existing ships under 150 gross tons, pleasure yachts not engaged in trade and fishing vessels. Article 5.2 also excludes ships navigating solely within the specifically listed geographical waters. Check domestic requirements separately. Load Lines, articles 4–5.
Scope of Application
Under the 1966/1988 regime, Article 19(9) also covers ineffective fittings, missing annual-survey endorsement and structural strength reduced enough to make the ship unsafe. Flag transfer is addressed separately in Article 19(11).
Procedure / How to Complete It
- Check certificate, endorsements and conditions of assignment.
- Compare freeboard marks with documents.
- Check relevant closures, openings and fittings.
- Submit changes for competent assessment before work.
- Record restoration, survey and required certificate action.
Practical Example
An ineffective closing appliance requires attention even without changes to hull geometry: unchanged certified freeboard is not sufficient.
What Typically Goes Wrong
Reducing all causes of invalidity to the need for increased freeboard.
Common Mistakes Mistake Library
| Mistake | How to avoid it |
|---|---|
| Reducing all causes of invalidity to the need for increased freeboard. | Check the individual ship’s requirements and documents before closing the work. |
What the PSCO Checks
Operational Tips
- Keep documents and reports in the same file.
- Record the owner, action and deadline for each finding.
- Check consistency after each document change.
Preparation checklist
- Applicable regime checked
- Documents consistent
- Changes assessed
- Surveys and authorisations documented
- Required actions tracked