SuperbaKnowledge Demonstration release
Platforms
ENIT
Core operations

Interactive Preparation Checklists

Interactive checklists gathered from all 12 thematic modules, for preparation and revision.

Learning checklists. They store progress in the browser and support study, familiarisation and preparation. They do not replace the SMS, approved procedures, manuals or documents, and completion does not demonstrate compliance or readiness: always verify current applicable requirements and documents.

Environmental operations

Before bunkering

Full page →

  • Before starting: bunkering plan agreed, product and compatibility checked, receiving tanks and available capacity confirmed with procedural margin.
  • Line-up, connections and containment checked; responsibilities, attendance, communications, rates/pressures and emergency stopping agreed with the supplier.
  • Sulphur and safety properties checked against fuel, plant and route, considering any approved equivalent and local requirements.
  • Sampling arranged where MARPOL VI/18.8 applies; at delivery check BDN and representative sample, seals and identification. For gas/low-flashpoint fuels check VI/18.5.2 documentation without assuming the same sample obligation.
  • Retention arranged: BDN at least 3 years; required MARPOL sample under ship control until substantially consumed and at least 12 months. Discrepancies to be recorded and reported.

Sources: IMO — Regulation 18; IMO — Annex VI supplement 2025 · Reviewed 16 September 2026.

Before entering/leaving an ECA

Full page →

  • Area boundaries, application dates and limits checked; SOx, NOx and local restrictions distinguished.
  • Where needed, changeover planned under a written procedure considering volumes, consumption, mixing and maker’s thermal limits; completion before entry.
  • On exit, any switch to fuel subject to the global limit started only after the boundary; no requirement to stop using already compliant fuel.
  • Flag-prescribed record ready: date, time, position and tank volumes at completion before entry or commencement after exit under VI/14.6.
  • For EGCS: approved equivalence and documents, parameters, alarms, records and failure procedure checked; local discharge restrictions checked.

Sources: IMO — Regulation 14 · Reviewed 16 September 2026.

Before a PSC — MARPOL documents and records

Full page →

Part one of two. The second, Before a PSC — certificates, equipment and SMS status, covers different checks: use them together, not as alternatives.

  • Applicability checked for ship and cargo: MARPOL certificates, supplements, endorsements and surveys due consistent; not every document is required on every ship.
  • Required ORB Parts I/II current and signed, consistent with tanks, volumes, receipts and operations; traceable corrections without fabricated reconstruction.
  • Applicable GRB and Garbage Management Plan current; Annex II Cargo Record Book and P&A Manual checked where required.
  • Applicable SOPEP/SMPEP available with ship/Company contacts and current IMO national contact list, including quarterly updates.
  • Applicable Annex VI evidence available: BDN/samples, changeover, EGCS documentation and required records; crew able to explain actual operation.
  • OWS and specified associated devices checked under procedures, with 15 ppm alarm/stopping where required and documented maintenance; no unlawful discharge to demonstrate operation.

Sources: IMO — SOPEP/SMPEP; IMO — PSC 2025 · Reviewed 16 September 2026.

Before sludge disposal in port

Full page →

  • Facility confirmed for sludge type and quantity; availability, port notifications and delivery arrangements agreed.
  • Tanks, actual quantities and volume to deliver checked; ORB I, C 11.1–11.3, updated at least weekly and manual collections recorded under C 11.4 where relevant. A company monthly balance does not replace these records.
  • Before transfer: line-up, connections and containment checked under procedure; responsible persons, communications, attendance and stopping agreed with the receiver.
  • After delivery: actual quantities and times, tanks involved and retained quantities recorded in ORB I under C 12.1; signature and facility details under the record book instructions.
  • Receipt obtained after delivery, checked against the transfer and ORB and filed; any differences clarified and traced.

Sources: IMO — ORB guidance, MEPC.1/Circ.736/Rev.2 · Reviewed 16 September 2026.

SMS, bridge and inspections

Before an internal ISM audit

Full page →

  • Audit plan, scope and criteria defined under the SMS; current procedures, previous findings and samples of actual operations available.
  • Auditor competent and independent of the area audited, unless impracticable due to the size and nature of the Company; rationale and arrangements to maintain objectivity documented.
  • NC/CAPA and near misses reviewed: owners, deadlines, analysis and effectiveness checks identified, including actions still open.
  • Latest Management Review and follow-up available; DPA contacts and role known to the crew.
  • Familiarization of new joiners and personnel changing duties checked through records and practical evidence, including essential instructions before sailing and requirements before assigned duties.
  • Emergency plans and drills reviewed; lessons assessed and necessary changes approved, distributed and reflected in controlled SMS documents.

Sources: IMO — ISM Code and amendments · Reviewed 16 September 2026.

Before a new crew member joins

Full page →

  • Qualifications, certificates and medical fitness checked against the assignment and applicable requirements.
  • Person responsible for familiarization identified; briefing in a language understood and understanding checked, including relevant demonstrations.
  • Essential ISM instructions identified, provided and documented before sailing.
  • Before assigned duties: required safety, security and ship-specific equipment/procedure familiarization completed. Further SMS training must not defer these prerequisites.
  • Alarms, escape routes, emergency stations and equipment explained; muster list duties assigned and understood.
  • Copy of the MLC complaint procedure provided and explained, with relevant contacts and the onboard person for confidential advice; familiarization records completed under the SMS.

Sources: IMO — ISM Code; MCA — Familiarization; ILO — MLC, A5.1.5 · Reviewed 16 September 2026.

Before departure (bridge team)

Full page →

  • Master-approved berth-to-berth passage plan: draught, UKC, no-go areas, weather/tides, pilotage and contingencies checked.
  • Charts and publications current; for ECDIS, ENCs, safety settings, route check and back-up verified.
  • Briefing completed: roles, rested watch, engine-room/pilot communications and Master call criteria agreed.
  • Steering gear checked and tested within 12 hours before departure under SOLAS V/26, unless an applicable flag waiver for short voyages applies; records available.
  • Navigation equipment, alarms and communications checked under the SMS; propulsion readiness and limitations confirmed with the engine room.
  • Muster list consistent with the crew; emergency systems status and periodic tests checked, with defects addressed before departure.

Sources: IMO — Voyage planning; SOLAS V — Navigation · Reviewed 16 September 2026.

Before a PSC — certificates, equipment and SMS status

Full page →

Part two of two. The first, Before a PSC — MARPOL documents and records, covers the environmental records.

  • Applicable statutory certificates, supplements, endorsements and surveys checked; class status reviewed separately.
  • Current documents accessible; electronic certificates verifiable under issuer instructions.
  • Critical equipment and maintenance records checked; functional tests under procedures and safe conditions.
  • Manning, qualifications, rest and familiarization checked; personnel able to demonstrate assigned duties.
  • Previous PSC findings and NC/CAPA tracked, with deadlines, actions and closure evidence; open defects reported and managed.
  • Under the applicable PSC regime, risk profile, inspection window and port notifications checked where required.

Sources: IMO — PSC 2025 · Reviewed 16 September 2026.

Before entering an enclosed space

Full page →

  • Risks assessed, space and connections identified, isolations checked; permit authorized and valid.
  • Atmosphere sampled at representative levels/areas with suitable instruments: oxygen, flammables and relevant toxics; results meet permit criteria.
  • Ventilation maintained; personal monitors and repeated atmospheric checks arranged.
  • Outside attendant present; communications and entry/exit accounting active.
  • Rescue planned, trained team and equipment ready; no improvised rescue entry.
  • Leave immediately on alarm or loss of safe conditions; reassess before re-entry.

Sources: IMO — MSC.581(110) · Reviewed 16 September 2026.

Surveys and reporting

Before entering dry dock

Full page →

  • Repair specification, priorities, spares and contingency allowance agreed; required work and surveys identified.
  • Docking plan and block arrangement checked with the yard against the actual ship configuration.
  • Draughts, trim, loads and tank levels agreed with the dockmaster; stability during landing and dewatering checked.
  • Class/flag/RO attendance and inspection points coordinated; thickness measurements defined by Rules, ship type/age, condition and history.
  • Ship-yard interface defined: isolations, permits, simultaneous work, fire protection, access, communications and shore services.
  • Responsibilities, work inspections, final tests and handover criteria agreed before work starts.

Sources: LR — Dry docking; USCG — Drydocking standard · Reviewed 16 September 2026.

Before a Renewal Survey

Full page →

  • Certificates and actual dates checked; renewal scheduled under the applicable instrument. The three months before expiry preserve the validity basis where provided, and are not a universal window.
  • Scope, preparations, safe access and tests agreed with flag/RO; any extensions formally authorized, never assumed.
  • Statutory and class status distinguished; findings and Conditions of Class addressed by their deadlines with accepted closure evidence.
  • Documents, maintenance and reports available; freeboard markings and IMO number checked where applicable.
  • Before treating renewal as complete: report, issued certificates/endorsements, new expiry dates and limitations checked.

Sources: IMO — HSSC 2025 · Reviewed 16 September 2026.

Before annual CII/EU ETS reporting

Full page →

  • CII/DCS and MRV/ETS applicability distinguished; consumption, distances and activity reconciled with their respective plans and supporting records.
  • Annual CII and rating checked for the emission year; SEEMP II/III consistent. Corrective plan in the SEEMP for D in three consecutive years or E, to be submitted for verification.
  • Verified MRV reports and aggregated Company data prepared for the following 31 March, unless an earlier date is required by the authority; ETS scope and any derogations checked.
  • Allowances available and Registry surrender scheduled by 30 September: in 2026, 70% of 2025 emissions subject to ETS; from 2027, 100% of the previous year’s emissions subject to ETS.
  • For emissions from 2026, CH4 and N2O included in ETS; surrender confirmation retained, since purchase alone does not fulfil the obligation.

Sources: IMO — CII; European Commission — Maritime ETS · Reviewed 16 September 2026.

Before a vetting inspection (SIRE 2.0 or CDI)

Full page →

TMSA is the Company’s self-assessment; shipboard evidence supports its declarations.

  • SIRE 2.0 or CDI programme confirmed; requirements, questionnaires and preliminary data checked against the current relevant programme.
  • For SIRE 2.0: PIQ, certificates, crew matrix and required photographs current; preparation based on the applicable Question Library, without assuming advance CVIQ access.
  • Crew ready to explain and demonstrate actual operations; equipment, procedures and human factors checked together.
  • Defects and previous observations reviewed with actions and evidence; controlled documents consistent with onboard conditions.
  • Security measures consistent with risks, route and applicable plan; operational evidence consistent with the Company’s declared TMSA.

Sources: OCIMF — SIRE 2.0; CDI — Inspection process · Reviewed 16 September 2026.

Passengers, cargo and emergencies

Before an abandon ship drill (boat drill)

Full page →

Abandon ship and fire drills have distinct objectives: plan applicable participation and frequencies and identify the activities completed for each in the record.

  • Scenario, risks, weather and operational conditions assessed; roles, communications and stopping criteria agreed.
  • Lifeboat, davit, winch and applicable release gear checked under manuals; maintenance and defects reviewed.
  • Participants briefed and familiarized; required lifejackets and immersion suits available and serviceable.
  • Launching, lowering and recovery planned for the craft type, applicable requirements and maker instructions; personnel exposure limited to what is necessary.
  • Drill communications checked; any radio tests in an authorized mode, avoiding false distress alerts.
  • After the drill: participants, activities, omissions and reasons recorded; debriefing, defects and follow-up actions tracked.

Sources: MCA — Lifeboat drill safety · Reviewed 16 September 2026.

Before passenger embarkation

Full page →

  • Count of all persons aboard reconciled before departure, within authorized limits; data and shore reporting under applicable requirements.
  • Gangway, access, lighting, signage and staffing checked; assistance arranged for persons needing it.
  • Escape routes, exits and muster stations accessible and clear; arrangement consistent with approved plans and evacuation analysis where required.
  • Instructions and safety cards available and understandable; new-passenger safety briefing arranged immediately before or after departure.
  • If the scheduled stay exceeds 24 hours: new-passenger muster before or immediately upon departure, with lifejacket and alarm instructions; additional applicable requirements checked.

Sources: IMO — Passenger muster and briefing; IMO — Passenger ship safety · Reviewed 16 September 2026.

Before loading/discharging operations

Full page →

  • Cargo information and quantities checked; plan and sequence agreed with the terminal under cargo-specific requirements.
  • Stability, stresses, draughts and ballast checked at intermediate and final stages; operating limits and transfer rates agreed.
  • Communications, attendance, stopping and change management defined; relevant ship-shore checklist completed.
  • Cargo Securing Manual applied where required; handling equipment, access and working areas checked.
  • Simultaneous-work and enclosed-space risks controlled; any permit supported by all required precautions.
  • Applicable records arranged: Annex II Cargo Record Book for bulk NLS; draft survey coordinated only where relevant to the operation.

Sources: IMO — BLU Code; IMO — Cargo securing · Reviewed 16 September 2026.

Before a critical engine room intervention

Full page →

  • Job, risks and impact on critical systems assessed using PMS and manuals; competent personnel, tools and required spares available before starting.
  • Permit authorized where required; energy sources isolated and locked/tagged, stored energy dissipated and isolation verified before work.
  • Bridge and responsible officers informed; unavailability, communications, simultaneous work and stopping criteria agreed.
  • Required redundancy and supplies confirmed for the job; emergency generator considered within its function and limits, not as a universal substitute.
  • Reinstatement planned: personnel and tools cleared, guards restored, isolations removed under control, tests and handover recorded.

Sources: MCA — COSWP 2026 · Reviewed 16 September 2026.

Before loading dangerous goods

Full page →

  • For packaged goods, IMDG 42-24 applied in 2026; classification, UN number, proper shipping name and subsidiary hazards checked.
  • Transport document and shipper declaration obtained; container/vehicle packing certificate where required, markings and external condition checked.
  • Ship and space suitability checked, including Document of Compliance where required; stowage, segregation and securing defined.
  • Required list/manifest or permitted stowage plan prepared and updated to actual cargo, with locations and required transmission before departure.
  • Emergency information, EmS and MFAG available; personnel trained for their duties. IMDG chapter 1.3 for shore personnel; relevant STCW/SMS requirements for crew.

Sources: IMO — IMDG edition; IMO — IMDG 42-24; MCA — Packing certificate · Reviewed 16 September 2026.

Last substantive revision: 16 September 2026 · page fingerprint d07ed693b147