SuperbaKnowledge Demonstration release
Platforms
ENIT
Core operations

Visual Library

Twenty original diagrams connect decisions, records and responsibilities to operational topics. Filters aid navigation; without JavaScript every item remains visible.

1Ship Risk Profile: category and inspection window

Ship Risk Profile: category and inspection windowShip parameters; Risk profile; Inspection windowShip parametersRisk profileInspection windowShip Risk Profile: category and inspection windowShip parameters; Risk profile; Inspection windowShip parametersRisk profileInspection window

The profile combines ship parameters, flag/RO/Company performance and history. Under Paris MoU, the periodic window does not exclude additional inspections triggered by overriding or unexpected factors. Check the applicable regime and current status in the official system.

Go to topic →

Source: Paris MoU — Selection scheme · Reviewed 16 September 2026.

2From report to verified CAPA

From report to verified CAPAReport; Classify under SMS; Cause and action; Verify effectivenessReportClassify under SMSCause and actionVerify effectivenessFrom report to verified CAPAReport; Classify under SMS; Cause and action; Verify effectivenessReportClassify under SMSCause and actionVerify effectiveness

Report and classify under the SMS; control immediate risk, analyse causes and assign actions, owners and deadlines. Verify effectiveness and prevention of recurrence through evidence; if insufficient, review and reopen follow-up.

Go to topic →

Source: IMO — ISM corrective action · Reviewed 16 September 2026.

3Berth-to-berth passage planning

Berth-to-berth passage planningAppraisal; Planning; Execution; MonitoringAppraisalPlanningExecutionMonitoringBerth-to-berth passage planningAppraisal; Planning; Execution; MonitoringAppraisalPlanningExecutionMonitoring

Complete berth-to-berth plan, including pilotage, approved by the Master before the voyage starts. Monitoring runs continuously alongside execution: changes assessed, recorded and communicated to the bridge team.

Go to topic →

Source: IMO — Voyage planning · Reviewed 16 September 2026.

4Planned Maintenance System cycle

Planned Maintenance System cyclePlan; Perform; Record; ReviewPlanPerformRecordReviewPlanned Maintenance System cyclePlan; Perform; Record; ReviewPlanPerformRecordReview

The PMS implements the SMS: intervals follow relevant requirements and instructions, defects and causes are recorded, and corrective actions followed through verification. Critical equipment needs reliability measures and standby tests; review the plan against results.

Go to topic →

Source: IMO — ISM, section 10 · Reviewed 16 September 2026.

5Bottom inspections: separate regimes

Bottom inspections: separate regimesCargo ship; 2 inspections / 5 years; Maximum 36 months; Authorized methodCargo ship2 inspections/ 5 yearsMaximum 36 monthsAuthorized methodBottom inspections: separate regimesCargo ship; 2 inspections / 5 years; Maximum 36 months; Authorized methodCargo ship2 inspections/ 5 yearsMaximum 36 monthsAuthorized method

Cargo: at least two bottom inspections within the five-year validity period, maximum interval 36 months; in-water inspection subject to applicable conditions. Passenger ships: annual inspection, normally at least two dry-dock inspections in five years; any reduction for non-ro-ro ships requires Administration acceptance and dedicated conditions.

Go to topic →

Source: IMO — HSSC 2025 · Reviewed 16 September 2026.

6Enclosed-space entry

Enclosed-space entryAssess and isolate; Ventilate and test; Authorize entry; Monitor / exitAssess and isolateVentilate and testAuthorize entryMonitor / exitEnclosed-space entryAssess and isolate; Ventilate and test; Authorize entry; Monitor / exitAssess and isolateVentilate and testAuthorize entryMonitor / exit

MSC.581(110): possible hazardous atmosphere or oxygen deficiency, plus at least one characteristic: limited openings, inadequate ventilation or space not designed for continuous occupancy. Assess connections too. Before entry: isolations, ventilation, tests, permit, attendant and rescue readiness; maintain monitoring and leave if conditions become unsafe.

Go to topic →

Source: IMO — Enclosed spaces 2025 · Reviewed 16 September 2026.

7ECA fuel changeover

ECA fuel changeoverCheck compliance; Plan changeover; Observe boundary; Record volumes/dataCheck compliancePlan changeoverObserve boundaryRecord volumes/dataECA fuel changeoverCheck compliance; Plan changeover; Observe boundary; Record volumes/dataCheck compliancePlan changeoverObserve boundaryRecord volumes/data

Check area, dates and compliance method. If changing fuel: written procedure, flushing/mixing time and plant limits; complete before entry, start the outward change only after exit. Record compliant fuel volumes, date, time and position under VI/14.6. For EGCS check approval, operation and local discharge restrictions.

Go to topic →

Source: IMO — MARPOL VI/14 · Reviewed 16 September 2026.

8Icebreaker assistance

Icebreaker assistanceCheck requirements; Receive instructions; Execute safely; Report changesCheck requirementsReceiveinstructionsExecute safelyReport changesIcebreaker assistanceCheck requirements; Receive instructions; Execute safely; Report changesCheck requirementsReceiveinstructionsExecute safelyReport changes

Check current notices, restrictions and assistance requirements for the area and season, including ice class and required conditions. Agree operating instructions and communications; maintain listening watch and manoeuvring readiness. The Master retains responsibility for the ship and promptly reports damage or inability to follow instructions. The cited Finnish/Swedish rules are not universal.

Go to topic →

Source: Fintraffic — Winter navigation · Reviewed 16 September 2026.

9HSSC, statutory and class

HSSC, statutory and classStatutory cycle; Flag/RO authorisation; Surveyor assignment; Separate evidenceStatutory cycleFlag/ROauthorisationSurveyor assignmentSeparate evidenceHSSC, statutory and classStatutory cycle; Flag/RO authorisation; Surveyor assignment; Separate evidenceStatutory cycleFlag/RO authorisationSurveyor assignmentSeparate evidence

HSSC harmonizes statutory surveys and certification under the applicable instrument. Check flag authorization of the RO, delegated scope and surveyor assignment; belonging to a classification society is insufficient. One attendance may cover several scopes, but class/statutory reports, certificates, deadlines and findings must remain distinguishable.

Go to topic →

Source: IMO — Recognized Organizations · Reviewed 16 September 2026.

10CII: from rating to action

CII: from rating to actionCalculate and verify; Assess A–E rating; D three years / E one; Correct and monitorCalculateand verifyAssess A–E ratingD three years/ E oneCorrect and monitorCII: from rating to actionCalculate and verify; Assess A–E rating; D three years / E one; Correct and monitorCalculateand verifyAssess A–E ratingD three years/ E oneCorrect and monitor

For ships subject to CII, calculation and rating are verified against the applicable year and category. D for three consecutive years or E for one year requires a corrective plan in the SEEMP, submitted to the flag/authorized organization for verification within one month of reporting CII. Implement the actions and follow their results.

Go to topic →

Source: IMO — MARPOL VI/28 · Reviewed 16 September 2026.

11EmS and MFAG

EmS and MFAGAlert and protect; Identify cargo; Relevant EmS / MFAG; Coordinate responseAlert and protectIdentify cargoRelevant EmS / MFAGCoordinate responseEmS and MFAGAlert and protect; Identify cargo; Relevant EmS / MFAG; Coordinate responseAlert and protectIdentify cargoRelevant EmS / MFAGCoordinate response

Activate the alarm and emergency plan promptly, protecting people. Identify cargo and location from documents and stowage; EmS addresses fire/spillage, MFAG first aid for exposure. If the substance is uncertain, do not improvise substance-specific measures: maintain protection and isolation, obtain information and specialist/medical advice without delaying safe initial actions.

Go to topic →

Source: IMO — EmS · Reviewed 16 September 2026.

12Passenger accounting reconciliation

Passenger accounting reconciliationRecord movements; Count all aboard; Reconcile and check; Report and updateRecord movementsCount all aboardReconcile and checkReport and updatePassenger accounting reconciliationRecord movements; Count all aboard; Reconcile and check; Report and updateRecord movementsCount all aboardReconcile and checkReport and update

Count everyone, including crew, and update embarkations/disembarkations at each call. Before departure reconcile the total, inform the Master and check authorized limits; record declared assistance needs. Personal data, shore reporting and retention follow the applicable regime; information must be available to rescue services.

Go to topic →

Source: MCA — Persons on board · Reviewed 16 September 2026.

13Emergency power chain

Emergency power chainMain supply failure; Designed source; Emergency switchboard; Required servicesMain supply failureDesigned sourceEmergencyswitchboardRequired servicesEmergency power chainMain supply failure; Designed source; Emergency switchboard; Required servicesMain supply failureDesigned sourceEmergencyswitchboardRequired services

Functional scheme: the emergency source may be a generator or battery under the approved design. Transitional supply, where required, supports assigned services during transfer; it is not a universal stage that starts the generator. Check starting/changeover, switchboard and required consumers, endurance, alarms and tests under SOLAS II-1/42 or 43 and the ship configuration.

Go to topic →

Source: MCA — Electrical installations · Reviewed 16 September 2026.

14Bunkering: ship–terminal barriers

Bunkering: ship–terminal barriersPrepare and agree; Check arrangement; Monitor transfer; Check and recordPrepare and agreeCheck arrangementMonitor transferCheck and recordBunkering: ship–terminal barriersPrepare and agree; Check arrangement; Monitor transfer; Check and recordPrepare and agreeCheck arrangementMonitor transferCheck and record

Before: check product, compatibility, capacity and line-up; agree rates, communications and stopping with the supplier. During: monitor levels, pressures and leaks, sampling where required. At delivery: check BDN, quantities and samples/seals, record discrepancies and retain records. For gas/low-flashpoint fuels apply VI/18.5.2 and specific procedures; a MARPOL delivered sample is not universal.

Go to topic →

Source: IMO — MARPOL VI/18 · Reviewed 16 September 2026.

15Cargo securing flow

Cargo securing flowVerify cargo data; Apply CSM; Secure before sailing; Inspect safelyVerify cargo dataApply CSMSecurebefore sailingInspect safelyCargo securing flowVerify cargo data; Apply CSM; Secure before sailing; Inspect safelyVerify cargo dataApply CSMSecurebefore sailingInspect safely

For cargo subject to a CSM, use the ship’s approved manual and reliable mass/unit data; check securing device capacity and condition, arrangement and voyage conditions. Complete securing before departure. Inspect and adjust underway only when safe; changes, adverse weather or cargo shifting require reassessment and Master’s decisions.

Go to topic →

Source: IMO — CSS Code · Reviewed 16 September 2026.

16IMDG segregation flow

IMDG segregation flowIdentify cargo; Assess all hazards; Table and specifics; Check arrangementIdentify cargoAssess all hazardsTable and specificsCheck arrangementIMDG segregation flowIdentify cargo; Assess all hazards; Table and specifics; Check arrangementIdentify cargoAssess all hazardsTable and specificsCheck arrangement

Use IMDG 42-24 in 2026: check UN number, proper shipping name and subsidiary risks. The general table is insufficient: consult the Dangerous Goods List, column 16b, groups/codes and specific provisions, which prevail in a conflict. Apply rules for the ship and transport unit; if data or compatibility remain uncertain, suspend acceptance pending clarification.

Go to topic →

Source: IMO — IMDG 42-24 · Reviewed 16 September 2026.

17UTM measure–decision loop

UTM measure–decision loopAgree scope; Measure and validate; Assess with surveyor; Act and verifyAgree scopeMeasureand validateAssesswith surveyorAct and verifyUTM measure–decision loopAgree scope; Measure and validate; Assess with surveyor; Act and verifyAgree scopeMeasureand validateAssesswith surveyorAct and verify

Agree scope and locations with the surveyor for the ship, survey and condition. Use an approved supplier where required; trace locations, instrument and validated readings. Compare with applicable structural criteria, without universal percentages; anomalies require assessment and possible extension. Repairs or monitoring must be accepted by class, with a consistent final report.

Go to topic →

Source: LR — Thickness measurement · Reviewed 16 September 2026.

18Condition of Class lifecycle

Condition of Class lifecycleRead requirement; Plan within deadline; Act and document; Obtain closureRead requirementPlanwithin deadlineAct and documentObtain closureCondition of Class lifecycleRead requirement; Plan within deadline; Act and document; Obtain closureRead requirementPlanwithin deadlineAct and documentObtain closure

Read the full requirement, limitations and due date; assign an owner and agree action and verification with the society. Do not assume extensions or automatic closure after repair: acceptance and status update are needed. An overdue item may affect maintenance of class under the Rules; separately check any statutory implications with flag/RO.

Go to topic →

Source: DNV — Vessel status · Reviewed 16 September 2026.

19EU ETS geographic scope

EU ETS geographic scopeCheck scope; 100% EEA / EEA ports; 50% EEA–non-EEA; Apply emission yearCheck scope100% EEA/ EEA ports50% EEA–non-EEAApply emission yearEU ETS geographic scopeCheck scope; 100% EEA / EEA ports; 50% EEA–non-EEA; Apply emission yearCheck scope100% EEA/ EEA ports50% EEA–non-EEAApply emission year

For ships/activities subject to ETS: 100% between EEA ports and within EEA ports; 50% for voyages between an EEA port and an external port, not for every foreign voyage. Check the port-of-call definition, excluded stops and derogations. Then apply phase-in by emission year: 2024 40%, 2025 70%, from 2026 100%; surrender in the following year.

Go to topic →

Source: European Commission — Maritime ETS · Reviewed 16 September 2026.

20GNSS resilience

GNSS resilienceDetect anomaly; Cross-check sources; Adapt navigation; Record and reportDetect anomalyCross-check sourcesAdapt navigationRecord and reportGNSS resilienceDetect anomaly; Cross-check sources; Adapt navigation; Record and reportDetect anomalyCross-check sourcesAdapt navigationRecord and report

A second GNSS display or receiver may share the error or interference. Cross-check position using radar, visual bearings and other available independent methods, considering their limitations. Inform the Master, check ECDIS/AIS and automation using suspect data; adopt alternative navigation and safety margins under the SMS, without indiscriminate disconnection. Record anomalies and report to the relevant authorities.

Go to topic →

Source: MCA — Electronic navigational aids · Reviewed 16 September 2026.

Last substantive revision: 16 September 2026 · page fingerprint 9fe8dc92b228