Statement of Compliance for Ships in Temporary Lay-up
Lay-up does not create one universal certificate or survey regime: the warm/cold arrangement, duration, class status, treatment of statutory certificates and recommissioning scope must be agreed for the ship with flag and class.
Operational Explanation
Temporary lay-up may be warm or cold, with different crewing, active systems, maintenance and operational readiness. A society may offer a notation, declaration or document under its own terminology; there is no single IMO “Statement of Compliance” that automatically suspends surveys.
Class and statutory certificates must be managed separately. During prolonged lay-up some statutory certificates may not be maintained through periodical surveys, while class status may follow a limited regime under the Rules. Return depends on duration, preservation, modifications, overdue surveys and actual condition.
Regulatory Reference
Apply the conventions and flag instructions for statutory certificates, society Rules for class and local authority requirements. One society’s procedures are not a universal regime. DNV — lay-up and reactivation.
HSSC 2025 §5.5 treats lay-up or a long period out of service for major repairs/modifications as possible special circumstances for dating a certificate following a late renewal. The Administration decides; the renewal retains its full scope and additional examinations may be needed depending on inactivity and preservation of hull and machinery. This does not automatically suspend due dates. HSSC 2025 §5.5.
Scope of Application
Ships taken out of service for commercial, technical or market reasons. Requirements and controls vary with location, duration, warm/cold mode, crewing, system status, flag, class and coastal authorities.
Procedure / How to Complete It
- Notify flag, class, insurers and relevant authorities.
- Agree the lay-up mode and status of class and certificates.
- Prepare safety, preservation, maintenance and test plans.
- Record surveys, audits and certificates falling due during the period.
- Derive recommissioning from actual condition, work and due dates.
Practical Example
For a ship in extended cold lay-up, Company, flag and class establish which certificates will not be maintained, which limited visits apply, and which overdue surveys, tests and checks are required before service.
What Typically Goes Wrong
Common Mistakes Mistake Library
| Mistake | Consequence | How to avoid it |
|---|---|---|
| Document treated as universal | Legal effect overstated | Read issuer, basis and conditions |
| Standard return scope | Too little or too much work | Use due surveys and actual condition |
What the PSCO Checks
Operational Tips
- Keep a register of deadlines, status and the issuer’s written decision for each certificate and survey.
- Retain maintenance, preservation, test and modification records.
- Before reactivation, also agree crewing, familiarization and flag-required ISM/ISPS verification.
Preparation checklist
- Warm/cold mode and duration defined
- Notifications completed
- Class and certificate status agreed
- Preservation and due dates recorded
- Return scope approved
FAQ
Related Topics
Last substantive revision of this page: 16 September 2026 · page fingerprint cf43d8478e94