Annual Survey
An Annual Survey checks continued maintenance of conditions relevant to the certificate. Plan it within its window, with documents, access and tests ready.
Operational Explanation
An annual survey is not certificate renewal. Prepare maintenance status, modifications and open defects; agree the checks required for that certificate and ship with the surveyor.
Regulatory Reference
IMO A.1207(34), HSSC 2025. Section 4.2: a window of three months before or after the anniversary date where an annual survey is required. IMO MEPC 84 approved a package of BWM amendments: draft approval, adoption and entry into force are separate stages. Do not treat the draft as an annual requirement already in force.
MARPOL VI/5.1.4 requires an annual survey within three months before or after the anniversary date, within regulation 5.1 (ships of 400 GT and above and the specified platforms, subject to applicable exemptions). Passenger ships are not excluded: identify the certificate and instrument rather than extending the SOLAS Passenger Ship Safety regime to MARPOL. IMO — MARPOL VI/5.1 and 5.1.4.
Scope of Application
Apply the survey scope to the actual certificate. Do not automatically call every recurring check an Annual Survey: cargo Safety Radio, for example, requires a periodical survey.
Procedure / How to Complete It
- Identify the certificate, anniversary date and survey due.
- Record window opening and closing and agree the programme.
- Prepare previous reports, modifications, maintenance and open defects.
- Arrange safe access and tests against the agreed scope.
- Check outcome, certificate endorsement and deadlines for required actions.
Practical Example
Anniversary date 15 September: annual window from 15 June to 15 December. Arrange access, tests and any repairs in advance; booking the surveyor does not establish survey completion.
What Typically Goes Wrong
Reducing the survey to paperwork, ignoring modifications or confusing a future BWM amendment with an effective requirement.
Common Mistakes Mistake Library
| Mistake | How to avoid it |
|---|---|
| Reducing the survey to paperwork, ignoring modifications or confusing a future BWM amendment with an effective requirement. | Check the individual ship’s requirements and documents before closing the work. |
What the PSCO Checks
Operational Tips
- Use a separate row for each certificate and survey.
- Assign each finding an owner and deadline.
- Retain completion evidence and endorsements.
Preparation checklist
- Certificate and survey identified
- Window checked
- Technical scope agreed
- Documents and access ready
- Outcome and findings recorded