SuperbaKnowledge Demonstration release
Platforms
ENIT
Regulatory update

CII: 2027-2030 Reduction Factors and New SEEMP Granularity

CII factors for 2027–2030, the enhanced DCS data timetable and SEEMP updates: connected topics with distinct rules and dates.

CIIMARPOL Annex VI Reg. 28SEEMPG3 Guidelines

Operational Explanation

Z factors progressively lower required CII relative to the 2019 reference line. Enhanced DCS granularity concerns the data collected instead. SEEMP connects Part II collection methods with Part III planning without conflating these two changes.

Regulatory Reference

Scope of Application

Z factors apply to ships subject to CII; DCS fields follow their own scope. They are not percentage cuts in a ship’s absolute emissions or reductions to apply each year to the previous year’s result.

Z factor relative to the 2019 reference line
YearZ
202611%
202713.625%
202816.250%
202918.875%
203021.500%

Procedure / How to Complete It

  1. Distinguish entry into force of amended Appendix IX on 1 August 2025 from the collection timetable in Circ.913.
  2. For existing ships, prepare Part II before ordinary collection starts on 1 January 2026; early application from 1 January 2025 was encouraged. Ships delivered from 1 August 2025 collect the new data from delivery.
  3. Separate consumption by consumer, under-way/not-under-way consumption, total distance, laden distance, hours under way and onshore power according to the applicable method.
  4. Use the transport-work metric prescribed for the ship type; do not impose tonne-miles on every category.
  5. Update required CIIs and Part III measures for the relevant three-year period, accounting for the 2027–2030 factors.

Practical Example

Simplified numerical example. With reference CII of 10, required CII is 8.9 in 2026 and 8.6375 in 2027: 10 × (1 − 13.625/100). Do not reduce 8.9 by 13.625%. This illustrates Z only; rating also needs the relevant category and boundaries.

What Typically Goes Wrong

Similar field names may conceal different scopes. Under SEEMP guidelines, canal passage is excluded from the under-way period; its distance does not disappear from total distance. These collection definitions do not replace navigation-rule definitions.

Common Mistakes

MistakeConsequenceHow to Avoid It
Applying Z to the previous year’s resultRequired CII is calculated from the wrong baseUse the reference line prescribed by regulation 28.4.
Assigning new collection from 1 August 2025 to every existing shipOrdinary collection is confused with entry into forceApply the Circ.913 distinction, including delivery of new ships.

What the PSCO Checks

Prepare the Part II methodology actually used and its confirmation, with applicable annual documents. Being able to explain the difference between total and under-way distance is more useful than producing two artificially identical columns.

Operational Tips

Preparation checklist

FAQ

Is transport work always measured in tonne-miles?
No. Table 1 of Circ.925 distinguishes metrics by ship type: for example, cruise passenger ships use passengers × distance; ro-ro passenger ships also report the prescribed cargo component.
Does MEPC.385 impose a separate 31 December 2025 Part III deadline?
Not in those terms. The Part II DCS timetable and the Part III three-year CII cycle have distinct bases; both must be met where applicable.
Does the 2030 factor require a 21.5% cut from 2029?
No. The 21.5% is relative to the 2019 reference line, not the previous year’s value.

Related Topics

Last substantive revision of this page: 15 September 2026 · page fingerprint 9c3af2326d44