IMO Net-Zero Framework
The IMO Net-Zero Framework remains an unadopted draft: MEPC 84 arranged further work toward MEPC 85 and possible resumption on 4 December 2026, not finalized detailed guidelines.
Operational Explanation
As of 15 September 2026, the draft approved at MEPC 83 has not been adopted. It combines a lifecycle fuel GHG-intensity standard with an economic mechanism. MEPC 84 provided for further negotiations: resumption of ES.2 on 4 December 2026 remains subject to MEPC 85 confirmation. Economic scenarios must retain these uncertainties explicitly.
Regulatory Reference
IMO — MEPC 84 outcomes; IMO — Net-Zero Framework FAQ. Draft approval, adoption and entry into force are separate stages.
Scope of Application
Thresholds, timetable, RU prices and supporting guidelines remain draft/open to amendment.
Procedure / How to Complete It
- Label every parameter draft/under negotiation.
- Do not use binding, has set or adopted before the act.
- For scenario analysis: draft RU Tier 1 USD100 and Tier 2 USD380/tCO2e, 2028–2030.
- Do not use prices as guaranteed liability.
- Update after MEPC 85/ES.2.
Practical Example
A charter scenario may model USD100/380 with sensitivity and a draft disclaimer, not as an operative price.
What Typically Goes Wrong
Writing MEPC 84 approved detailed implementation guidelines or prices have been set.
Common Mistakes Mistake Library
| Mistake | Consequence | How to Avoid It |
|---|---|---|
| Writing MEPC 84 approved detailed implementation guidelines or prices have been set. | Non-compliant decision or treatment | Follow the approved arrangement and applicable sources |
What the PSCO Checks
Operational Tips
- Version scenarios, assumptions, sources and dates; separate hypothetical costs from current obligations.
- Review assumptions after official MEPC outcomes without anticipating negotiations.
Preparation checklist
Educational checklist. This summary supports learning and preparation only. It does not replace the vessel’s approved procedures, manuals, statutory documents, company SMS, or applicable official requirements. Completing it demonstrates neither compliance nor readiness for an inspection: it shows that a list has been read, not that the ship is in order. Always verify the current documents carried on board.
- Draft status
- No binding date
- RU draft labelled
- Scenario only
- Update gate
FAQ
Related Topics
Certified substantive revision: 16 August 2026 · page fingerprint 5ab5b93adf6a