Tail Shaft Survey
Propeller-shaft survey method, interval, withdrawal and any extension follow UR Z21 as incorporated in class Rules; condition monitoring creates no autonomous CMS tail-shaft regime.
Operational Explanation
Propeller-shaft survey method, interval, withdrawal and any extension follow UR Z21 as incorporated in class Rules; condition monitoring creates no autonomous CMS tail-shaft regime.
Regulatory Reference
IACS UR Z21 and applicable Classification Society Rules.
UR Z21 distinguishes closed oil- or fresh-water-lubricated systems from open water-lubricated systems. Also identify the propeller coupling, seals and shaft protection: do not transfer methods or monitoring data from a different arrangement. IACS UR Z21.
For example, Method 3 for closed systems requires relevant records and samples together with checks of bearing wear, accessible parts, propeller and seals, and verification of no reported grinding or welding repairs to the shaft/propeller. Check method eligibility in the Rules: a satisfactory oil analysis meets only part of the conditions. IACS UR Z21, 2.1.3.
Scope of Application
Shaft type, lubrication/sealing arrangement, monitoring, results and Rules determine method/interval; Machinery Continuous Survey is distinct.
Procedure / How to Complete It
- Identify shaft arrangement and Z21 method.
- Check due date and withdrawal requirements.
- Collect oil analysis, bearing temperature and seal records where required.
- Use monitoring for modified method/extension only if Rules allow.
- Obtain surveyor acceptance before omitting withdrawal.
Practical Example
Quarterly oil analysis may be required evidence, but alone does not replace the due propeller-shaft survey.
What Typically Goes Wrong
Presenting Continuous Machinery Survey/CMS as an autonomous choice to avoid shaft withdrawal or using one five-year cycle.
Common Mistakes Mistake Library
| Mistake | Consequence | How to Avoid It |
|---|---|---|
| Presenting Continuous Machinery Survey/CMS as an autonomous choice to avoid shaft withdrawal or using one five-year cycle. | Non-compliant decision or treatment | Follow the approved arrangement and applicable sources |
What the PSCO Checks
Operational Tips
- Separate current requirement, class/maker, SMS and voluntary guidance.
- Do not improvise tests, thresholds or intervals.
- Record deviations and corrective action.
Preparation checklist
- Z21 method
- Arrangement
- Due date
- Monitoring conditions
- Surveyor acceptance
FAQ
Related Topics
Last substantive revision of this page: 15 September 2026 · page fingerprint 4806fdcb0150