SuperbaKnowledge Demonstration release
Platforms
ENIT
Operational guide · Safety & equipment

ECDIS (Electronic Chart Display and Information System)

Carriage requirement, back-up arrangement and ENC updating: the most common errors that turn ECDIS from a safety tool into a source of PSC deficiencies.

SOLAS Chapter VECDISENCback-up

Operational Explanation

When ECDIS fulfils the chart-carriage requirement, it must be used with updated ENCs, route-appropriate alarms and an adequate back-up arrangement. STCW ECDIS competence does not replace documented familiarisation with the installed equipment and configuration.

Regulatory Reference

SOLAS V/19.2.1.4 addresses nautical charts and use of ECDIS; V/19.2.1.5 requires back-up where those functions are performed wholly or partly electronically. V/19.2.10 sets mandatory carriage categories, while V/27 requires adequate and up-to-date charts and publications. Check equipment approval and the back-up arrangement accepted by the flag. STCW competence and familiarisation with the installed system are distinct; a separate type-specific certificate is not a universal international requirement. IMO ECDIS.

S-100 transition: MSC.530(106)/Rev.1 applies to new installations from 1 January 2026 as an alternative to the previous standard, and to all new installations from 1 January 2029. This timetable does not require replacement of every existing ECDIS in 2029. Check the applicable standard against installation date and approval. MSC.530(106)/Rev.1.

Scope of Application

The carriage requirement follows ship type, size and date. Voluntary ECDIS used only as an aid, while a complete and updated paper portfolio remains the compliant primary means, does not automatically enter the ECDIS back-up regime.

Procedure / How to Complete It

  1. Identify which means fulfils the chart-carriage requirement in the ship's approved configuration.
  2. If it is ECDIS, verify ENCs, updates, alarms and the approved back-up; paper charts qualify only when complete, updated and accepted as part of that configuration.
  3. Verify officers' STCW competence and document familiarisation with the installed equipment, software, sensors and back-up.
  4. Require a type-specific course or certificate only where the Administration or SMS does so.

Practical Example

Example pre-departure check: "Primary ECDIS updated with ENCs valid as of 2026-07-08; back-up arrangement verified (second ECDIS on independent power supply); anti-grounding alarms configured for the planned route to Genoa."

What Typically Goes Wrong

An automatic route check does not replace examination at an appropriate scale and review of available information. Check safety contour, safety depth, cross-track limits and alarms against draught and planned margins; cross-check position and sensors, including the route loaded on the back-up.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
ENCs not updated or subscription expiredNavigation with outdated chart data, PSC deficiencySystematically verify ENC update status before every departure
Anti-grounding alarms disabled to reduce false alarmsLoss of ECDIS's main safety functionCorrectly configure alarm thresholds for the specific route, don't disable them
Back-up arrangement not working or not periodically verifiedNo redundancy in case of primary ECDIS failurePeriodically test the back-up arrangement as part of onboard checks
Familiarisation with the installed ECDIS model is undocumented or incompleteIncorrect use of the system's specific safety functionsDocument familiarisation with the installed model; require a type-specific course or certificate only where the Administration or SMS requires it

What the PSCO Checks

The PSCO checks the approved configuration, ENC updates, alarms, back-up and evidence of competence and familiarisation. There is no universal international requirement for two separate generic and type-specific certificates.

Operational Tips

Preparation checklist

FAQ

Can paper charts be the back-up?
Only if complete, updated and part of the ship's compliant, approved configuration; merely carrying charts is not enough.
Is generic ECDIS training sufficient?
STCW competence does not replace onboard familiarisation. Its documentary form and any specific certificate depend on the Administration and SMS.

Related Topics

Last substantive revision of this page: 15 September 2026 · page fingerprint a6bde12e0fe4