Autonomous Ships (MASS): the Company's Responsibility under the SMS

Autonomous or remote operations need explicit roles and operating conditions: the Company, Master and remote centre are not interchangeable. The non-mandatory MASS Code provides a framework to coordinate with ISM, authorisations and the ship's concept of operations.

MASSISM CodeMSC.595(111)Remote Operation CentreSMS

Operational Explanation

The MASS Code, adopted by MSC.595(111) and effective from 1 July 2026 as a non-mandatory instrument, distinguishes Company responsibilities, the Master's authority and ROC functions. It does not allocate all responsibility to one person or replace ISM. Section 14.2.1 provides for a human Master responsible at all times, for only one MASS at a time; when persons are onboard, the Master must be onboard under this framework.

The SMS must describe who decides, who operates, and who provides support and monitoring, consistent with the concept of operations (ConOps), operational envelope (OE) and authorised conditions. The DPA retains ISM §4 functions and is not automatically the ROC's operational manager. A lost connection cannot be resolved by a generic 'switch to manual' instruction where no attended local control exists or remote control depends on the failed link.

Regulatory Reference

Sources: MSC.595(111), MSC 111/22 Annex 16 · IMO MASS FAQ · ISM A.741(18), §§3–5 · ISM amendments. The MASS framework is non-mandatory; applicable mandatory instruments and authorisations remain to be complied with. The roadmap towards a mandatory code in 2032 is a target, not an adopted entry-into-force date. MSC 112, scheduled for December 2026, is to develop the Experience-Building Phase framework; this is not an automatic start of that phase.

Scope of Application

The MASS Code addresses cargo ships to which SOLAS chapter I applies, including relevant ROCs; the Administration may determine its application to other ships where existing instruments are impracticable or insufficient. Cargo high-speed craft under SOLAS X and warships, naval auxiliaries or government ships on non-commercial service are excluded. An automated function alone does not make every ship a MASS: assess scope, ConOps and authorisations.

Procedure / How to Complete It

  1. Determine applicable scope, ConOps, OE and authorisation conditions with the Administration and other competent parties.
  2. Define Company responsibilities, the Master's authority, ROC management and operators in the SMS; preserve the DPA's monitoring and liaison functions.
  3. Define operator competence, availability and responsibilities under the approved framework without inventing a universal certification requirement.
  4. Document and test control transfer, degradation, link loss and fallback conditions: each response must be feasible in the actual configuration.
  5. Manage the change through risk assessment, approvals, training and pre-use verification; separately monitor future Code developments.

Practical Example

Training example: for an uncrewed project, the Company defines a human Master, ROC roles and DPA functions. The link-loss plan uses a fallback condition specified and demonstrated in the ConOps/OE and accepted for the project, not an impossible manual takeover. Authorisation conditions are checked before operational trials.

What Typically Goes Wrong

MASS operations require integrated management of technical and organisational risks. The SMS must make decision responsibilities, control transfers, operating limits and failure responses verifiable, including loss of communications. Test the intended fallback arrangements and record who exercises control.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
MASS responsibility allocated generically to the DPAMonitoring and operational control become confusedDistinguish Company, Master, ROC and DPA
Link loss answered by unavailable manual controlFallback cannot be executedDemonstrate the response within the ConOps/OE and actual configuration
2032 roadmap treated as an adopted obligationIncorrect regulatory statusSeparate the voluntary Code, current authorisations and future developments

What the PSCO Checks

The non-mandatory MASS Code does not exempt ships from applicable mandatory instruments. ISM auditors and authorities examine the SMS, responsibilities and relevant authorisation conditions, including any MASS commitments incorporated into those authorisations.

Operational Tips

Preparation checklist

Educational checklist. This summary supports learning and preparation only. It does not replace the vessel’s approved procedures, manuals, statutory documents, company SMS, or applicable official requirements. Completing it demonstrates neither compliance nor readiness for an inspection: it shows that a list has been read, not that the ship is in order. Always verify the current documents carried on board.

FAQ

Does the MASS Code replace ISM?
No. It is a non-mandatory framework to coordinate with existing obligations and authorised conditions.
Must the DPA manage the ROC?
Not automatically: the DPA retains ISM §4 functions. ROC operational management and the Master's authority must be separately defined.
How should link loss be handled?
Through fallback and contingency responses specified, demonstrated and accepted for the ship's ConOps/OE and configuration, without assuming manual control is always available.